1,000,000 Post Thread

Well, I called my solar company this morning to find out what the hold up for was for turning on my solar.
 
It turns out they hadn't even bothered to submit the inspection paper work yet even though the inspection was done 6 weeks ago.
 
On the 16th they told me I would have my permission to operate on the 26th. Today is the 27th and they still haven't bothered to do the paperwork.